Precinct Line Rd at Walker Branch, TxDOT Fort Worth District and City of Fort Worth, TX
OVERVIEW

TxDOT and the City of Fort Worth collaborated on this bridge replacement project which included elevating the approaches above the base flood and channelizing a portion of the natural channel. HHR prepared hydrology and hydraulics analysis of the proposed improvements including watershed analysis, floodplain study, impact/mitigation analysis, channel geometry and lining design, construction plan sheets, and preparation of Conditional Letter of Map Revision (CLOMR) request.